start your project with us

Through a unique combination of engineering, construction, and design disciplines, Artemis delivers world-class 3D modelling & Rebar placing drawings to clients across a broad range of industries..

Combine FMb & Approval Plan

FMB (Floor Master Building) and CMB (Completion Master Building) approval plans are essential components in the construction and real estate industry, particularly for multi-storey buildings and developments. These plans are vital for ensuring compliance with building codes, safety regulations, and overall project quality.

FMB (Floor Master Building) Approval Plan:

The Floor Master Building (FMB) approval plan is a detailed blueprint for constructing each floor of a multi-level building. It includes important elements like room layouts, corridors, stairs, elevators, plumbing, and electrical systems. The plan must follow local building codes to ensure safety and functionality. It guides construction teams in meeting precise requirements for each floor and ensures the building matches the approved design. Essentially, the FMB plan ensures safe and accurate construction.

CMB (Completion Master Building) Approval Plan:

The Completion Master Building approval plan is submitted at the end of a construction project. It documents the final as-built conditions of the building, reflecting any modifications or adjustments made during the construction process. This plan is crucial for obtaining the necessary approvals from local authorities and serves as a record of compliance with the approved FMB and other permits. The CMB plan confirms that the building has been constructed in accordance with the initial plans, and any changes are properly documented for future reference.

2D plan & elevation

- 2D plans and elevations are indispensable tools in the construction and design process. They offer a clear and detailed depiction of the layout and visual appearance of a project, enabling effective communication among professionals and clients and serving as a crucial reference throughout the construction journey.

- 2D plans and elevations play a crucial role in the architectural and construction process. They serve as essential communication tools between various stakeholders, enabling them to collaborate effectively, make informed decisions, and ensure the successful realization of the building project. Whether for residential, commercial, or industrial structures, accurate 2D plans and elevations are vital for creating functional, safe, and aesthetically pleasing spaces.

OUR TOP SERVICE

rebar detailing 2D & 3D

2D Rebar Detailing :

We make drawings that show where steel rods (called rebar) should be placed in buildings. Our team of expert engineers create these drawings in both imperial and metric measurements. We use software called Rebar CAD and CADS-RC to make the drawings and we give them to you in PDF and DWG formats.

3D Rebar Detailing:

"3D Detailing" is a specialized process used in construction and civil engineering. It involves creating three-dimensional models of reinforcing steel bars (rebars) for reinforced concrete structures. The process includes 3D modeling, clash detection, quantity takeoff, shop drawings, and bar bending schedules. 3D rebar detailing ensures accurate rebar placement, reduces errors, and enhances communication among stakeholders, leading to efficient construction and more durable concrete structures."

BIM & 3D MODELLING

BIM : (Building Information Modeling)

BIM is a collaborative and data-driven process integrating 3D modeling and information management. It focuses on creating 3D models with extensive data on building elements and attributes. BIM enables real-time collaboration among stakeholders, analysis, and lifecycle management. BIM promotes efficiency, cost savings, and improved building performance throughout its lifecycle.

3D Modelling :

3D modeling creates digital representations of objects or scenes using specialized software. It involves designing, modeling, texturing, lighting, and rendering to achieve realistic 3D visuals. 3D modeling is used in various industries, including likr Structural & architecture engineering.

Bar Listing

The bar lists are submitted seven to ten days before the set delivery date or the date mentioned by the Fabricator whichever is earlier.

Material list separation

The materials are ordered based on their loading and unloading sequence and are split per shipping sequence.

Avoid Light Load charges

By making sure that each group of releases achieves full truck, we make sure that the client avoids light load charges.

Patch lists

Our team understands that changes are common and patch lists are important to keep the construction work going. So customer RFIs, Addendums and change requests from the field are highly prioritized and necessary patch lists are issued instantly for Fabrication by coordinating with Fabricator and Placing team to ensure timely delivery.

Transforming Visions into Reality

Our placing drawings help in Fabrication and allow placing to be done cost-effectively, leading to the completion of the constructions without any delay.

Easy to understand

Each sheet is designed separately with unique bar bending schedule in the same sheet, helping the placer to work without difficulty. Enough cross-sections and enlarged details are taken at congested locations.

Fabrication and placer friendly

All unconfined bars are grouped to reduce the bar marks in a placer friendly way, making it easy for fabrication.

Communication

Project manager coordinates with the placing team and takes in all their suggestions for detailing, helping in carrying out the placing with ease. Then he gets confirmation from Structural engineer, if needed, before working on the placing drawings at the detailing stage.

Three-level checking process

All drawings go through a three-level checking process before
submitting them to the client.
Self Checking

The drawings are reviewed by the Engineer who is handling the project. All the corrections are done before it goes to the next level i.e., Quality Checking.

Quality Checking

The drawings are reviewed by an experienced team leader to make sure all the details from the contract drawings are followed and ensure that each standard specified by the client is met. Then the drawings are sent to the review of Project Manager.

Project Manager Review

This is the last and final review, where the project manager thoroughly checks the drawing from the aspects.

Why Choose us ?

We’re passionate about our work, keep our promises and solve problems without any complications.

Start Your Project Now !

Embark on Your Journey of Innovation